GOOD
INDIA
KERALA
Road, drainage works progressing along Palarivattom corridor
The laying of interlocking tiles has been completed over a short stretch in front of St. Martin’s Church at Palarivattom, while groundwork, including the spreading of metal and surface levelling, is under way
Read the original at The Hindu · Kerala ↗